Track Layout History |
2002 - Stillhouse Branch Added |
|
In the Spring of 2002 the railroad completed its first major trestle over
Stillhouse creek and within three months had its first real mainline
running from the Eagle Point loop around the shop out to Saddleback Wye
where trains could turn and return to Eagle Point. This 1200' of mainline
is the Stillhouse branch divided into two blocks and crossed the highest
elevation on the railroad at Summit. |
A three track yard was added as well as the two leads into the future
steaming bays. The powered loading lift and the transfer table for the
steaming bays were also installed in 2002. Additionally scale structures
started showing up.
|
|
|
|
|