EPRR Track Plan
Track Work Progress
Click image for larger picture
2023/06/03 - Painting and Tie Replacement On Monteagle Steel Bridge
2023/05/13 - Falcon Gap Bridge Tie Replacement Project
2020/04/27 - Double Track Project
2016/06/04 - Logging Route Turnout Installation
2016/04/29 - Fuel Storage Repair
2016/04/23 - Steal Rail Delivered
2016/03/05 - Second Unloading Ramp Finished
2016/02/20 - Progress on Second Unloading Ramp
2015/08/17 - Recent Track Work At Mile Post 7-0
2015/08/17 - Repair Tracks Covered
2015/08/15 - Mattox-King Storage
2015/03/02 - Temporary Access Path
2015/03/02 - Stumps Removed For Car Barn Expansion
2015/03/02 - Recent Scale Building Renovation
2015/02/07 - Yard Power/Light Tower Complete
2015/02/07 - Fredonia Prep Work For Additional Storage Barn
2015/02/07 - Controlled Burn
Oct 4, 2014
325 gallon water tower set at Cumberland for steamer and bathroom
Aug 1, 2014
Upper car barn yard replacement complete
Jul, 2014
Car barn track progress
Jun, 2014
Car barn track progress
Jun 7, 2014
First of five curved replacement turnouts for the upper car barn yard installed
Apr 5, 2014
New industrial siding at Daus
Unloading improvements
Dec 17, 2013
Stone Creek trestle is finished and the Sequatchie branch is open



Depot siding is finished



Nov 30, 2013
Depot siding work





Only 15 feet left to be laid

Before Nov 30, 2013
Two trestle bents added

Nov 9, 2013
Siding finished and trestle started

Nov 2, 2013
Track clearing required to get to work sites


Siding being dug


Boiler room addition to Morrison Structure

Oct 29, 2013
Track at both sides of Stone Creek Trestle





Improvements at loading lift

Sep 6, 2013
Recent track photos





Liberty Meat



Aug 25, 2013
Daus siding 75% complete


Track 85 feet from trestle


Mattox-King storage progress

Aug 15, 2013
Progress at Daus



250 feet from the trestle

Aug 3, 2013
Extending the Hobbstown Branch




Jul 26, 2013
Just over 100 feet from Daus siding





Progress on Depot track


Jul 13, 2013
Track 200 feet beyond Hobbstown


Depot track siding started

Structure work



Jul 11, 2013
Hobbstown siding complete




Jun 29-30, 2013
Extending Hobbstown siding


Structure preperation



Two Allen industries nearing completion



Jun 15, 2013
Recent work around the track



Jun 8, 2013
Recent work around the track








Jun 5, 2013
Henley Switch loop completed


Jun 1, 2013
15 feet to make connection




New industry for Allen


May 18, 2013
Miscellaneous Progress



May 3, 2013
Progress on last 60 feet of dig


Apr 20, 2013
Miscellaneous work photos



Apr 13, 2013
New retaining wall at TC Junction

Henley's Switch area



Grundy Feed rebuild

Warren storage

Apr 6, 2013
Replacement whistle posts

Depot track ballasted




Henley's Switch



Ballast work all day






Quick progress on rock


Mar 25, 2013
Rock uncovered in the exit trench

Henley's Wye almost half complete



Mar 2, 2013
Second industrial siding at Henley's Switch installed


First Henley's Wye turnout set (future EP&W branch)


Feb 8, 2013
Rear Depot track added




Henley's Switch Progress through Feb 7




Howard Warren's Train Shed

Feb 2, 2013
Work Conditions



Jan 28, 2013
New turnouts for future private storage sheds


Jan 23, 2013
Henley's Switch Loop

Approach to turnout

Diverging routes from the turnout

Far side of the cut on the East side of the loop

Larry's train storage shed
Dec 1, 2012
Loop above 70' trestle



Nov 3, 2012
Completed 70' trestle




Nov 3, 2012
Start of 70' trestle



Low rock retaining wall for future track






Oct 28, 2012
Track 70' past bridge


Oct 19, 2012
All Depot storage track connections complete


Oct 13, 2012
Interior turnout installed


Overnight tree damage - Scouts due in 20-minutes


Track 30' past bridge


2nd Fuel Storage Shed


New structure pad almost complete

Oct 5-6, 2012
Pad for new structure started


Clearing parking area

1st Depot storage tracks connected





1st trains stored

Oct 4, 2012
Rail is across bridge





Sep 29, 2012
Decking completed to west side


Sep 8, 2012
Steel work done across valley





Depot storage tracks installed




Aug 27, 2012
Bridge reaching west bank





Aug 8, 2012
Hobbstown


PJ Wendt Bridge




Coalmont water tower

Station seating rehab

Gasoline storage

Aug 8, 2012
4th span added




July 21, 2012
1st Hobbstown siding and industry turnouts


Hobbstown trestle

Colmont water tank finished


4th span in place

June 15, 2012
Note: due to extream heat, there was little progress over the last 6-weeks.
Third major section in place


June 2, 2012
Trestle to Hobbstown




PJ Bridge



Next span section

New Yard Lights

Water tank at Colemont


Depot ready for rails

Leveling parking area



May 19, 2012
East Sequatchie branch onto trestle



2nd tower ready to intall


May 5, 2012






Apr 27, 2012
Sequatchie branch back under construction from Sale Creek



Testing Telegraph poles


Apr 14, 2012
Bridge shots



Apr 7, 2012
Bridge shots


Wood Gnome's Present

Next track laying

Parking leveling


Mar 25, 2012
Handrails added last week w/temp rope.

2012/03/17
2012/03/03 - Rocky Top Pavilion
2012/03/03 - Views from Rocky Top
2012/03/03 - PJ Bridge Progress
2012/03/03 - Moving Span to Site
2012/02/28 - Lifting A Span
2012/02/28 - Rocky Top Pavilion Started
2012/02/25 - Deck Progress
2012/02/04 - Next Section Ready
2012/01/28 - Oops...
2012/01/25 - New Bridge Section Ready
2012/01/25 - New Heavy Trucks Put to Work
2012/01/21 - Bottom of First Tower Set
2012/01/21 - Next Span Being Built
2012/01/07 - Moving Bottom Half of First Tower
2011/12/30 - Rail Out on 3rd Span
2011/12/30 - View from Current End
2011/12/30 - Laager Wye Cut
2011/12/17 - Temporary Track Laid from Monteagle Ind. to Bridge Bottom
2011/12/17 - Moving 16' Tall Steel Bent
2011/12/03 - Second Span Added
2011/12/03 - View From West Slope
2011/12/03 - Wye Dig Into Rock
2011/11/12 - Bents For Bridge
2011/11/12 - View From Monteagle
2011/11/12 - First Span Set
2011/11/05 - Wye Dig Hits Rock
2011/11/05 - Bridge Started
2011/10/26 - Wye Tail Close To Halfway Dug
2011/10/26 - Track Now Ends At EP&N Interchange Point
2011/10/26 - Red Line Marks 25' Height of Next Bridge
Check history page for older photos