Track Layout History
2005 - Kimball Trestle Added
In 2005 the big achievement was the completion of the 250' long Kimball trestle with an 80' wye leg in just four months. The 115' long Lower Stillhouse trestle was completed first along with the Grundy siding. The track also started around Millpond and reached over to Deerhead siding by the end of the year. The Jasper siding was also added at the west end of the Fredonia branch next to the Eagle Point loop.

Future Promontory Branch