Eagle Point Railroad Track Work Progress
2024
•
5/11
Rebuilding Stillhouse trestle
2023
•
6/3
Painting and tie replacement on Monteagle steel bridge
•
5/13
Falcon Gap bridge tie replacement project
2020
•
4/27
Double track project
2016
•
6/4
Logging route turnout installation
•
4/29
Fuel storage repair
•
4/23
Steal rail delivered
•
3/5
Second unloading ramp is finished
•
2/20
Progress on second unloading ramp
2015
•
8/17
Recent track work at mile post 7-0
•
8/17
Repair tracks are covered
•
8/15
Mattox-King storage
•
3/2
Temporary access path
•
3/2
Stumps removed for car barn expansion
•
3/2
Recent scale building renovation
•
2/7
Yard power and light tower complete
•
2/7
Fredonia preperation work for additional storage barn
•
2/7
Controlled burn
2014
•
10/4
325-gallon water tower set at Cumberland for steam engines and bathroom
•
8/1
Upper car barn yard replacement complete
•
7/?
Car barn track progress
•
6/?
Car barn track progress
•
6/7
First of five curved replacement turnouts for the upper car barn yard installed
•
4/5
New industrial siding at Daus
•
4/5
Unloading improvements
2013
•
12/17
Stone Creek trestle is finished and the Sequatchie branch is open
•
12/17
Depot siding is finished
•
11/30
Depot siding work
•
11/30
Only 15 feet left to be laid
•
11/30
Two trestle bents added
•
11/9
Siding finished and trestle started
•
11/2
Track clearing required to get to work sites
•
11/2
Siding being dug
•
11/2
Boiler room addition to Morrison structure
•
10/29
Track at both sides of Stone Creek trestle
•
10/29
Improvements at loading lift
•
9/6
Recent track photos
•
9/6
Liberty Meat
•
8/25
Daus siding 75% complete
•
8/25
Track 85 feet from trestle
•
8/25
Mattox-King storage progress
•
8/15
Progress at Daus
•
8/15
250 feet from the trestle
•
8/3
Extending the Hobbstown branch
•
7/26
Just over 100 feet from Daus siding
•
7/26
Progress on the Depot track
•
7/13
Track 200 feet beyond Hobbstown
•
7/13
Depot track siding started
•
7/13
Structure work
•
7/11
Hobbstown siding complete
•
6/30
Extending Hobbstown siding
•
6/30
Structure preparation
•
6/30
Two Allen industries nearing completion
•
6/15
Recent work around the track
•
6/8
Recent work around the track
•
6/5
Henley Switch loop completed
•
6/1
15 feet to make connection
•
6/1
New industry for Allen
•
5/18
Miscellaneous progress
•
5/3
Progress on last 60 feet of dig
•
4/20
Miscellaneous work photos
•
4/13
New retaining wall at TC Junction
•
4/13
Henley's Switch area
•
4/13
Grundy Feed rebuild
•
4/13
Warren storage
•
4/6
Replacement whistle posts
•
4/6
Depot track ballasted
•
4/6
Henley Switch
•
4/6
Ballast work all day
•
4/6
Quick progress on rock
•
3/25
Rock uncovered in the exit trench
•
3/25
Henley's Wye almost half complete
•
3/2
Second industrial siding at Henley's Switch installed
•
3/2
First Henley's Wye turnout set (future EP&W branch)
•
2/8
Rear Depot track added
•
2/8
Henley's Switch Progress through Feb 7
•
2/8
Howard Warren's train shed
•
2/2
Work conditions
•
1/28
New turnouts for future private storage sheds
•
1/23
Henley Switch loop
•
1/23
Approach to turnout
•
1/23
Diverging routes from the turnout
•
1/23
Far side of the cut on the East side of the loop
•
1/23
Larry's train storage shed
2012
•
12/1
Loop above 70' trestle
•
11/27
Completed 70' trestle
•
11/3
Start of 70' trestle
•
11/3
Low rock retaining wall for future track
•
10/27
Track 70' past bridge
•
10/20
All Depot storage track connections complete
•
10/13
Interior turnout installed
•
10/13
Overnight tree damage - scouts due in 20 minutes
•
10/13
Track 30' past bridge
•
10/13
Second fuel storage shed
•
10/13
New structure pad almost complete
•
10/6
Pad for new structure started
•
10/6
Clearing parking area
•
10/6
First Depot storage tracks connected
•
10/6
First trains stored
•
10/6
Rail is across bridge
•
9/29
Decking completed to West side
•
9/8
Steel work done across valley
•
9/8
Depot storage tracks installed
•
8/27
Bridge reaching West bank
•
8/18
Hobbstown
•
8/18
PJ Wendt bridge
•
8/18
Coalmont water tower
•
8/18
Station seating rehab
•
8/18
Gasoline storage
•
8/8
Fourth span added
•
7/14
First Hobbstown siding and industry turnouts
•
7/14
Hobbstown trestle
•
7/14
Coalmont water tank finished
•
7/14
Fourth span in place
•
6/2
Trestle to Hobbstown
•
6/2
PJ Wendt bridge
•
6/2
Next span section
•
6/2
New yard lights
•
6/2
Water tank at Coalmont
•
6/2
Depot ready for rails
•
6/2
Leveling parking area
•
5/19
East Sequatchie branch onto trestle
•
5/19
Second tower ready to install
•
5/5
a>
•
4/29
Testing telegraph poles
•
4/27
Sequatchie branch back under construction from Sale Creek
•
4/14
Bridge shots
•
4/7
Bridge shots
•
4/7
Wood gnomes present
•
4/7
Next track laying
•
4/7
Parking leveling
•
3/25
Handrails added last week with temporary rope
•
3/17
a>
•
3/3
Rocky Top Pavilion
•
3/3
Views from Rocky Top
•
3/3
PJ bridge progress
•
3/3
Moving span to site
•
2/28
Lifting a span
•
2/28
Rocky Top Pavilion started
•
2/25
Deck progress
•
2/4
Next section ready
•
1/28
Oops...
•
1/25
New bridge section ready
•
1/25
New heavy trucks put to work
•
1/21
Bottom of first tower set
•
1/21
Next span being built
•
1/7
Moving bottom half of first tower
2011
•
12/30
Rail out on 3rd span
•
12/30
View from current end
•
12/30
Laager Wye cut
•
12/17
Temporary track laid from Monteagle industry to bridge bottom
•
12/17
Moving 16' tall steel bent
•
12/3
Second span added
•
12/3
View from West slope
•
12/3
Wye dig into rock
•
11/12
Bents for bridge
•
11/12
View from Monteagle
•
11/12
First span set
•
11/5
Wye dig hits rock
•
11/5
Bridge started
•
10/26
Wye tail close to halfway dug
•
10/26
Track now ends at EP&N Interchange point
•
10/26
Red line marks 25' height of next bridge